We have a Serv-U MFT server that is being backed by a SQL 2014 database for users/groups. This will be deployed as a clustered configuration for Serv-U so the DB is required. The problem I am having is the everything works great with a couple users in the database but when we load the 5000 we need to, it tends to lock up the servu application for around 10 minutes. The ServU server has 12GB of memory and 2 vCPUs (in vmware).
Has anyone had this behavior and possibly know how to fix it?
Thanks,
David